The Schwing Stetter (UK) Blog

Read the latest posts from our 'news from within' or visit the full blog here.



Reptor Video

(Posted: Wednesday, May 10, 2017 4:12 PM)


It seems, looking at the viewing statistic that you blog readers rather like the videos I put up from time to time and also stuff to do with the new S 38 SX 'Reptor' mobile pump.

Well then as a special Schwing Stetter May bonus - here for your viewing pleasure is a combination of both!


This short video showing the new mobile pump at work was sent to me this afternoon by our good colleagues in Germany and as soon as I saw it I thought I need this to be public so our customers and friends can see this amazing new machine at work.

Enjoy!




More Platforms

(Posted: Tuesday, May 2, 2017 3:50 PM)


Such was the success of our new workshop mezzanine floor last year (and the new floor space over the new reception area) that we decided to add a double version at the other end of the workshop!

Once again the lads rose to the task and had the thing built and stocked in less than a month.



The view's not too bad from up there either!





Schwing Gallery

(Posted: Monday, April 24, 2017 2:28 PM)



The drive to fill up our office wall space with working testimonies to our products continues. The original lines of pictures along the hallway has been extended through into the room beyond as we try to visit more clients on site and showcase the work they are doing using their Schwing Stetter machines.

It's not just this hallway, we've put up pictures all over the place. It's more pleasant than looking at blank walls too.

Perhaps we'll end up with people popping round just to see our collection of concrete placement related images! Although I suspect the National Gallery will be resting easy for a bit longer...




Goodbye Ray

(Posted: Monday, March 27, 2017 10:50 AM)


In memory of Ray Perry




Schwing Stetter Health and Safety Officer
who sadly lost his battle with Leukemia
March 2017

Ray’s contributions to our workplace went
far beyond his job description, both
professionally and personally.
Missed by everyone.




The Reptor Has Landed

(Posted: Thursday, March 16, 2017 4:18 PM)



The first Schwing S 38 SX mobile concrete pump has finally arrived in the UK!

The 'Reptor' so named due to the booms ability to manoeuvre and reach into places other boom just can't reach, is a five section mobile pump that can open out in under 7.4 metres.

Our key engineers had already been over to Germany to see this amazing new machine in action but now it is the turn of the rest of us to gaze upon it's majesty.

I suspect this will be a very popular pump and find myself wondering who is lined up to be the owner of this first magnificent machine...




Showing Concrete

(Posted: Friday, February 17, 2017 10:33 AM)



Yesterday was my annul trip to Birmingham NEC to visit the UK Concrete Show. It's always a good opportunity to catch up with a few people and to see the new development in the world of all things concrete.

The highlight this year was to see the large Utiform display area and catch up with Ian (our Utiform representative). We work with Utiform and sell their screed pumps and other products. They had a much smaller set up last year so it was great to see them expanding their reach this time round.





A Great Reception

(Posted: Monday, February 13, 2017 12:18 PM)



If there's one thing you can say about our engineers at Schwing Stetter, it's that they are versatile. We have recently been making some adjustments to the workshop area, extending the mezzanine floor and sprucing up the reception area. And it was none other than our own engineers who did the major work.

We now have quite bit more upstairs floor space to accommodate our expanding parts inventory, and a much nicer front reception area (as you can see above).

Here are a few photos from different stages of the work...

Staircase reversed

Our Engineers' steelwork taking shape

The floorboards down and the new reception desk

Extra space for more (genuine Schwing Stetter) parts storage

Our engineers even install signage (note the new ceiling is now in place too)!



An Interesting Puzzle

(Posted: Monday, January 23, 2017 11:44 AM)


As regular readers will know, a part of my job (a part I particularly enjoy) is to visit clients on site and get photos of their Schwing pumps and other Schwing Stetter equipment in action. The photos normally end up on our office walls in one form or another and on our website. I'm not a trained photographer but I'd like to think I have a reasonable eye and occasionally an image comes out particularly well.

One such image turned up after I spent some time with a camera up at the Merseylink Gateway bridge project where Reillys had three Schwing pumps working at the same time. We were so pleased with this image that we turned it into a puzzle - just for something a bit different and interesting. (It also features this month in the Schwing Stetter calendar!)

Last weekend I decided it was time to have a go at doing the puzzle. So on Saturday afternoon I cleared the dinning room table and emptied the pieces out onto it. For some extra interest, I rigged up my camera above the table to take a shot every thirty seconds to create a time-lapse video of the puzzle being done.


The 1000-piece puzzle came together over the course of the weekend with help from the whole family.

Sadly the camera did move a bit during the project - it was held to the room light fitting with cello-tape (this was a spur of the moment idea - not a major production!) so whilst I've tried to compensate in 'post production', there is a bit of movement and at times the corners are cut off. However if you can get past that, and like puzzles (and time lapse photography), and possibly concrete pumps, you might enjoy this little video...  (It's 1 minute, 21 seconds long - in case that matters to you...)




Later Posts | Earlier Posts
Visit the full blog for more...

To keep up to date with our latest blog posts follow us on Twitter or on Facebook.