Kelly Formwork won the contract to pour the concrete base in the Crossrail tunnels in the Woolwich section of the project. They needed to pump concrete though 1.3km of pipeline and were unable to do this with the equipment they were using.

They contacted Schwing Stetter who provided them with a a Schwing BP3500 stationary pump and a backup BP2800 pump. The Schwing pumps pushed the concrete straight through the line with capacity to spare.