Project details:


Schwing Separate Placing Boom Model SPB30 with 20m octagonal tubular column


Schwing Separate Placing Boom Model SPB30 with 20m octagonal tubular column


The SPB30 placing boom with 30m horizontal reach, mounted on 20m tubular column supported a heavy duty cross frame at the basement level. The boom and tubular column will be supported on floor frames with hydraulic self-climbing system when the upper floors are constructed. The photo shows the advantage of using a placing boom within very tight site conditions.

The equipment was supplied to C J O'Shea Plant Hire Ltd of Mill Hill, London. Photo shows the boom being used on the Abbey House Project in Baker Street, London, being carried out for Ability Developments by the C J O'Shea and Co. Ltd.

O'Shea Group web site: www.cjoshea.co.uk

 