Project details:


Schwing Separate Placing Boom Model SPB30


Schwing Separate Placing Boom Model SPB30


Schwing Separate Placing Boom Model SPB30 is shown mounted on 8m freestanding octagonal tubular column and supported on a heavy duty cross frame. The cross frame is secured to the slab with 8 No. high tensile bolts. The tubular columns are supplied in 6m sections to make 8m, 14m and 20m freestanding height to suit different applications.

The boom and tubular column could be moved from one location to the next to cover the whole site using the tower cranes. Schwing SPB30 weighs 6400kg and can be split easily into two separate pieces of 3800kg and 2600kg. Having no counter-weights, it makes the moving of boom from one column/location to the next a quick and simple process.

Supplied to Michael J Gallagher Contractors Ltd of Guildford, Surrey. The photo shows the boom being used in conjunction with a Schwing BP1800 HDRD concrete pump on the Budds Farm Waste Treatment Works Project in Havant, Hampshire for 4 Delivery Ltd.

Michael J Gallagher Contractors Ltd web site: www.michaeljgallagher.co.uk

 
« Previous | Next »