Project details:


Schwing Separate Placing Boom Model SPB30


Schwing Separate Placing Boom Model SPB30


Schwing Separate Placing Boom Model SPB30 is shown mounted on the 20m octagonal tubular column and supported on 2 No. specially designed floor frames.

The floor slabs are "post-tension" design and the boom is used to pour the floor slab, walls, columns and cores.

The floor frames are located on the completed floor slabs below the level shown. The boom and column are then lifted through the building on the floor frames by the self-climbing mechanism, powered by the placing boom's own hydraulic system. There is no need to use the tower crane to lift the boom and tubular column up through the building.

Supplied to John Doyle Construction Ltd of Welwyn Garden City, Hertfordshire. The photo shows the boom being used on a commercial development in Park Royal, London, for Bowmer and Kikrland.

John Doyle Construction Ltd web site: www.johndoyleconstruction.co.uk

 