Schwing Separate Placing Boom Model SPB30
Dunne were awarded the contract to construct the waste bunker at the Ferrybridge Power Station, West Yorkshire. This represented an extremely ambitious...
Schwing Separate Placing Boom Model SPB30
Schwing Separate Placing Boom Model SPB30 with 20m octagonal tubular column. The placing boom with 30m horizontal reach, mounted on 20m tubular column...
Schwing Separate Placing Boom Model SPB30
Schwing Separate Placing Boom Model SPB30 is shown mounted on the 20m octagonal tubular column and supported on 2 No. specially designed floor frames....
Schwing Separate Placing Boom Model SPB30
Schwing Separate Placing Boom Model SPB30 is shown mounted on 8m freestanding octagonal tubular column and supported on a heavy duty cross frame. The cross...
Schwing Separate Placing Boom Model SPB30 with 20m octagonal tubular column
The SPB30 placing boom with 30m horizontal reach, mounted on 20m tubular column supported a heavy duty cross frame at the basement level. The boom and...
Schwing Separate Placing Boom Model SPB30 (& KVM31/27)
Schwing Separate Placing Boom Model SPB30 with 20m octagonal tubular column and Schwing placing boom model KVM31/27 with 14m round column. The foreground...
Schwing Separate Placing Boom Model SPB30
Schwing Separate Placing Boom Model SPB30 with 20m octagonal tubular column The placing boom with 30m horizontal reach, mounted on 20m tubular column...
Schwing Separate Placing Boom Model KVM31/27-125
The separate placing boom with 27m horizontal reach is mounted on 6.5m long top section of the 14m freestanding tubular column. The equipment was supplied...
Schwing Separate Placing Boom Model KVM31/27-125
The three booms illustrated were supplied to P C Harrington Contractors Ltd for use on their BP1 Contract at Canary Wharf. One boom is mounted on a...