Sending leftover concrete to landfill is expensive, but too little can cost even more in terms of wasted time. Recovering raw materials from unused concrete with Stetter Recycling Plant for reuse and save both time and money. (Not to mention the environment).
| Washing Capacity (m³/hr): | Continuous Feed Capacity (m³/hr): | Flushing Water Quantity: | Water Capacity in Drum: | Base System Dimensions: | Motor Rating: | Feed Hopper Height: | Data Sheet | Brochure |
|---|---|---|---|---|---|---|---|---|
| 12 | 0.2 | 7-12 | 2 | 5,7 x 3,2 x 2,7 m | 1 x 3 kW | 1.53 | View | |
| 20 | 0.33 | 8-15 | 4 | 7,3 x 3,2 x 2,8 m | 2 x 3 kW | 1.53 | View | |
| 6 | 0.1 | 6-10 | 0.9 | 5 x 3.1 x 2.4 | 1 x 3 kW | 1.4 | View |